So now that I have my airline companies established, I decided to work on my other companies today:
- Contractors
- AviationFuelSuppliers
- Banks
- Franchises (Food & Shops), and Food Franchises as follows:
4.1 Bakeries, Bars, Cafes, & Restaurants.
Here is how I organized my Native mod files for my franchises (you can also see the location of my other company mods as well:
Here are the final products (franchise final products in the link above):
AviationFuelSuppliers:
Contractors:
Banks:
Im so excited to have everything so personalized!!! Now its time to redesign SFO once I finish adding all the all the shops and food franchises.
Here is the company that is actually constructing the new Terminal 1 redesign that I will be using when I restart my build of SFO. I will also probably be using Chevron as the AviationFuelSupplier as they have a refinery not to far from the airport and I use to work for Chevron but I might try to look up who does supply SFOs Jet fuel…
I have decided to completely redesign it and start over. I am no longer going to use small stands and instead going to use medium stands for all my gates. This will mean that I will run out of space fast as they take up way more room. And if that is the case I an mo longer going to be able to do the whole airport layout. I am going to have to divide the airport into section by terminal. Terminal 1 alone (with the new design completing in 2023/4) has 35 gates, Terminal 2 has 14, and Terminal 3 has about 39. Im going to stay away from the international terminal for now as we don’t have larger aircraft in the game yet. So that is not going to be possible to do in one APCEO boundary.
So those images above are from my Google Sheets I made to calculate things for my Airports and to put all the information into one place to refer to. Here are more sections I have in the sheet.
The key:
Needed Vehicles:
Terminal and Runway Data
Staffing Section:
Airline by Terminal:
Shops and Food Franchises by Terminal:
Alright. Time to go design! Until next time! Cheers…